Residential


Marina 2 Tower
Location :Dubai Marina, Dubai. Project :2B+G+7+R+Toproof Building type : Hotel apartment.
Consultant: Al asri consultant office .
Main contractor : Ahmed bin dasmal Building contracting Date of work : 2013. Status : completed.
Scope of work : Structured cabling, Smartv, Sound system, Gate barrier, Access control..


Barsha Tower:
Location :Barsha-1, Dubai. Project :3B+G+14+R+Toproof Building type : mixed-use.
Consultant: Pioneer Expert consultancy.
Main contractor : Ahmed bin dasmal Building contracting
Date of work : 2015. Status : completed.
Scope of work : Electrical, water supply, drainage, structured cabling, smartv, sound system, gatebarries, access control, CCTV..


Moon Tower :
Location :business bay , Dubai. Project :3B+G+3P+17+R+Toproof Building type : mixed-use.
Consultant: Al khawajah engineering consultant.
Main contractor : Ahmed bin dasmal Building contracting
Date of work : 2016. Status : completed.
Scope of work : Electrical, Water supply, Drainage system, Hvac(Empower).
Other Projects
❖Muteena Building : Location :Al muteena, Dubai. Project :B+G+2+R+Toproof.
❖Bait Al Neel Building :Location :Hor al anz, Dubai. Project :G+2+R+Toproof.
❖Al drainy Building:Location :Abu Hail, Dubai. Project :G+2+GYM+Toproof.
❖Hareb-2 :Location: Al muraqabat, Dubai. Project :G+4+R+Toproof.
❖Jeikor Building :Location: Hor Al Anz, Dubai. Project :G+2+R+Toproof.
❖Arabco Building: Location :Abu Hail, Dubai. Project :G+2+R+Toproof.
❖Hareb-3 Building: Location :Naif , Dubai. Project :G+4+R+Toproof.
❖Murad Building : Location: Jabal ali , Dubai. Project :G+4+R+Toproof.
❖Al Drainy Building : Location: Naif, Dubai. Project :G+M+1+R+Toproof.
❖Commercial Building: Location :Al Awir , Dubai.Project :G+R+Toproof.
❖Milk Factory : Location :Al Awir , Dubai. Project :G+R+Toproof.
❖Mousque : Location: Al awir , Dubai. Project: Ground Floor.
❖4 Villas : Location : Alawir , Dubai . Project : G +1+R
Healthcare


Shiekh Khalifa Medical City – Ajman
Narcotic Cold Room
Complete Site renovation & Equipments supply & Installation


Burjeel Hospital - AbuDhabi .
Complete renovation of the oncology department, including civil works, electrical works, plumbing,HVAC, medical gas network, and all interior
finishing and furnishing works.


Kings College Hospital – Dubai
Complete Operation Room Site Preparation including
Panels and Infrastructure requirements.


Complete renovation for CSSD repartment and site
preparation for Medical Equipments installation
including design work-flow.
Axisrise Bulding Contracting L.L.C
Your trusted partner for construction and engineering solutions.
contact
stay updated
+971(04)5751060
© 2025 Axisrise Bulding Contracting. All rights reserved.
